翻訳と辞書
Words near each other
・ Lexington Senior High School (North Carolina)
・ Lexington Stakes
・ Lexington State Bank
・ Lexington Steele
・ Lexington Street
・ Lexington Symphony
・ Lexington Theological Seminary
・ Lexington Township
・ Lexington Township, Clark County, Kansas
・ Lexington Township, Johnson County, Kansas
・ Lexington Township, Le Sueur County, Minnesota
・ Lexington Township, McLean County, Illinois
・ Lexington Township, Michigan
・ Lexington Township, Scott County, Indiana
・ Lexington Township, Stark County, Ohio
Lexington Transit Center
・ Lexington VA Medical Center
・ Lexington, Alabama
・ Lexington, Albemarle County, Virginia
・ Lexington, Baltimore
・ Lexington, California
・ Lexington, Carroll County, Indiana
・ Lexington, Edwards County, Illinois
・ Lexington, Georgia
・ Lexington, Illinois
・ Lexington, Indiana
・ Lexington, Kansas
・ Lexington, Kentucky
・ Lexington, Kentucky, in the American Civil War
・ Lexington, Le Sueur County, Minnesota


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Lexington Transit Center : ウィキペディア英語版
Lexington Transit Center

The Lexington Transit Center is a one-story public transportation facility with an underground parking garage along Vine Street east of South Limestone in Lexington, Kentucky. It features numerous bus stalls and two indoor waiting rooms, with buses running every 35 minutes for much of the day. Completion of the transit center occurred in 1990 and was completed in conjunction with the Harrison Avenue (now Martin Luther King Drive) viaduct reconstruction.
== History ==
The original plans for the Lexington Transit Center included a large apartment complex that would front both sides of Harrison Street.〔Poole, Shelia M. "Work on downtown apartments may start in fall." 27 July, 1987. Herald-Leader (). 10 Nov. 2006.〕 The One Eleven apartment project was scheduled to begin in November 1987 with preliminary ground work, with actual construction beginning in the spring of 1988. The developers of the project included Warren W. Rosenthal, chairman of Jerrico Inc., Hugh Bennett of Bennett Architects Inc. and real estate developer Bill Combs. The site was the former home of the Charlie Sturgill car dealership.〔Honeycutt, Valarie. "Projects large and small creating downtown Lexington of the future." 30 Nov. 1986. Herald-Leader (). 10 Nov. 2006.〕
The original proposal called for 320 apartments with 425 parking spaces at 24 floors with a cost of $42 million.〔Duke, Jacqueline. "Council backs revived downtown apartment project." 5 June 1985. Herald-Leader (). 12 Nov. 2006.〕 The project, initially proposed in February 1984, was never constructed after the developers from First Lexington Company failed to obtain a federal grant and private financing needed to complete the project.〔 It was originally agreed that the Urban County Council would apply for a $1.9 million federal grant and authorize $21.7 million in housing bonds, with the city contributing $494,000 in local matching funds.
In 1985, it was proposed that the project include 296 one-bedroom and two-bedroom apartments, with eight penthouses, three levels of commercial space, and 354 parking spaces.〔 The One Eleven project was to include a "walk-through mall" between High and Vine Street, a swimming pool and health club, meeting rooms, and an outdoor garden and entertainment area. It was publicly resurrected by the developers of the project and had garnered support from the Urban County Council. Federal aid for the project had already been approved, however, and a $35 million bond was issued for multifamily housing; the First Lexington Company was contributing $2.9 million, with the Kentucky Housing Corporation providing some financing. The total cost was to be $41.2 million.
Financing troubles delayed the project once again in 1986.
Later, two apartment complexes were proposed, one for each side of Harrison Street.〔 The estimated cost of the apartment structure complex was now $35 million and would include two separate buildings, one on the west side of Harrison Street, and the other on the east side. Each structure would have been 22 floors, with 240 one-, two-, and three-bedroom apartments in each complex. The project also consisted of a transit center with an underground parking structure that would face Vine Street. The apartments would face High Street.
On September 26, 1987, a $2.2 million federal grant was issued from the Urban Mass Transportation Administration to purchase land for the transit center and underground parking structure. The cost of the apartment-transit project had ballooned to between $47 million and $57 million.〔Honeycutt, Valarie. "City gets $2.2 million grant for transfer station project." 26 Sept. 1987. Herald-Leader (). 5 Dec. 2006.〕
On December 1, 1987, an agreement was reached between the local government and the developers.〔"Agreement reached on transit project." 2 Dec. 1987. Herald-Leader (). 5 Dec. 2006.〕 Then-Mayor Scotty Beasler stated that the government will purchase of downtown property "east and west of Harrison Avenue viaduct this week" so that a transit center and a 700-space underground parking structure could be constructed. The developers would retain air rights on the west side of the property so that a high-rise apartment structure could be constructed above the transit center in the future and also paid the government $1.5 million for a 99-year lease for 200 parking spaces in the garage if in the future they wanted to construct the apartment tower. Construction began in late-1988 on the $13 million transit center and parking structure with no immediate plans to build the high-rise.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Lexington Transit Center」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.